Humble2 – Bathrooms

The project required the construction of 24 bathrooms in total, distributed across three buildings, “8 bathrooms in each building.”

Frame

Building the structure.

First stage of walls

Frame covering.

Second stage of walls

Taping, floating, and sanding.

Wall finishing

Primer, painting, and rubber installation.

Ceiling

Ceiling tile installation.

Bathroom finishing

Bathroom accessories installation.