HWY 6 – Reconstruction

The project required the construction of a concrete floor, internal and external walls around the building, internal wall partitions, and ceiling tiles.

Floor

Demolition of the old concrete floor and construction of the new one.

Walls

Internal wall partitions: “sheetrock, taping, floating, sanding, and FRP internal division.”

Ceiling tile – floor tile

4 4-inch by 4-inch tile was installed.

Ceiling tile

Steps had to be added to the ceiling because different heights were required.

Exterior walls and door installation

Installation of external and internal doors.

Paint

Exterior and interior painting of the building.

Exterior walls

Plywood, homewrap, and siding were installed on the exterior walls of the building.

Completion of contracted work

Finishing and detailing of the entire project.