HWY 6 – Reconstruction The project required the construction of a concrete floor, internal and external walls around the building, internal wall partitions, and ceiling tiles. FloorDemolition of the old concrete floor and construction of the new one. WallsInternal wall partitions: “sheetrock, taping, floating, sanding, and FRP internal division.” Ceiling tile – floor tile4 4-inch by 4-inch tile was installed. Ceiling tileSteps had to be added to the ceiling because different heights were required. Exterior walls and door installationInstallation of external and internal doors. PaintExterior and interior painting of the building. Exterior wallsPlywood, homewrap, and siding were installed on the exterior walls of the building. Completion of contracted workFinishing and detailing of the entire project.